Fakeeh Madina Hospital

Fakeeh Madina Hospital

The North Jeddah Wastewater Pumping Station shafts project forms part of a larger infrastructure development supporting a new wastewater treatment plant located north of Jeddah adjacent to King Abdulaziz International Airport.


Location Jeddah, Kingdom of Saudi Arabia
Total Value 990M SAR
Scope of Work Complete design services (architectural, structural, MEP).
Establishing a technical office on site to provide architectural and structural design evaluation, QS, QA & QC, as well as MEP services in addition to validation with detailed shop drawings for shafts, all other structures, station buildings and landscape development.
Issued as-built detailed drawings for the final handing over of the project.
Delivered over 3,000 drawings and other structural design services, bar bending schedules, hydraulic studies and quantity surveys.
Client National Water Company

The project includes gravity sewer systems reaching depths of 70 meters below ground level and consists of multiple buildings and specialized structures including one screen shaft and two pump shafts with a diameter of 40 meters and a depth of 70 meters, supporting the city’s expanding utility and environmental infrastructure network.

In Partnership with
Partner Logo
Partner Logo
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.